- IGD SiiQ: Consulting for the development of the Environmental Management System and the achievement of ISO 14001 certification
- ABACO TEAM, GABETTI Group: Consulting for the maintenance of the Environmental Management System and the achievement of ISO 14001 certification”
- FIAT PARTECIPAZIONI – Executive Project and Construction Management, air conditioning system, and ventilation system for the renovation of Mechanics Workshops 3 (total area: 35,000 sqm) located in Turin, Fiat Mirafiori plant
- BORLA INDUSTRIE S.P.A – Executive Project and Construction Management of the air conditioning system for clean-room 7 (air handling unit of 120,000 m3/h)
- SKF INDUSTRIE S.P.A. – Product Warehouse – Airasca, via Pinerolo 54. Energy Audit
- PETRONAS – LUBRICANTS ITALY – Villastellone Plant – summer and winter air conditioning systems for Rig Test laboratories
- FERRERO S.p.A. – Alba Plant – Executive Project of refrigeration plant for the production of glycol water – 17°C
- CORCOS Industriale S.P.A. – Pinerolo – New Logistics Center (7,000 sqm of warehouses and 2,000 sqm of offices). Executive Project of summer and winter air conditioning systems
- CARTIERA CASSINA – Pinerolo. Preparation of INAIL applications for the replacement of a generator for the production of 10,000 kg/h of steam at a pressure of 12 bar, and design of the related gas supply line.
- GENERAL MOTORS Powertrain Europe S.r.l. – Via Castelfidardo, 36 Turin – energy diagnosis to comply with the indications of Legislative Decree no. 102/2014 (Annex 2).
- PRALAFERA ENERGIA sarl – Cogeneration plant for electricity production (5.2 MW) and thermal waste. Design of district heating network for the Municipality of Luserna San Giovanni.
- LAURETANA SpA – Campiglie, 56, Graglia (BI) Plant – Executive Project and Construction Management of summer and winter air conditioning systems for bottling departments.
- MENABREA – Biella Plant. Executive Project and Construction Management of summer and winter air conditioning systems for infusion departments (2016)
- FCA PARTECIPAZIONI – Functional redevelopment of offices – air conditioning systems, ventilation system (16,000 sqm), in Turin, Corso Orbassano, entrance 12.
- YASKAWA ITALIA SRL – Warehouse Heating system project at Via Don Pietro Giordano 10 Orbassano
- BORLA Industrie S.p.A. – Moncalieri. Executive Project of new 2 MW methane gas thermal plant
- BORLA Industrie S.p.A. – Moncalieri. Executive Project of new air conditioning system for Clean Room 10 (air handling unit of 30,000 m3/h)
- Calizzano Mineral Water – Madonne delle Grazie Street plant in Calizzano – Executive Project and Construction Management for winter air conditioning systems for the new bottling plant
- AMEDEO DI SAVOIA HOSPITAL – Turin – Final and Executive Project of thermo-mechanical systems for the microbiology laboratory of Denis Pavilion
- DOMORI – None – Executive Project and Construction Management of summer and winter air conditioning systems for the new industrial plant (warehouse, offices, and production department)
- Municipality of VARESE – NZEB school building in collaboration with Settanta7 Architecture Studio (2020)
- Municipality of BORGOSATOLLO (Brescia) – NZEB school building in collaboration with Settanta7 Architecture Studio (2020)
- Municipality of RIVALTA (Turin) – NZEB school building in collaboration with Settanta7 Architecture Studio (2020): Energy Diagnosis development and GSE practice
- Municipality of SAN GIMIGNANO (Siena) – School building in collaboration with Settanta7 Architecture Studio (2020): Energy Diagnosis development, post-operational APE, and GSE practice
- Municipality of OSTANA (Cuneo) – Multipurpose Center in collaboration with Iris S.r.l. and Walden S.r.l. (2020): Energy Diagnosis development, post-operational APE, and GSE practice
- Municipality of BOLOGNA – NZEB Market Sonato in collaboration with Settanta7 Architecture Studio (2021): Energy Diagnosis development and GSE practice
- Municipality of CIVATE (Lecco) – School building in collaboration with Settanta7 Architecture Studio (2021): Energy Diagnosis development, post-operational APE, and GSE practice
- Municipality of CAPRALBA (Cremona) – NZEB school building in collaboration with Settanta7 Architecture Studio (2022): GSE practice
- Municipality of COSTIGLIOLE SALUZZO (Cuneo) – NZEB school building in collaboration with Settanta7 Architecture Studio (2022): Energy Diagnosis development and GSE practice
- Municipality of CASALBORGONE (Turin) – School building in collaboration with Settanta7 Architecture Studio (2022): Energy Diagnosis development and GSE practice
- Municipality of CHIARAVALLE CENTRALE (Catanzaro) – NZEB school building in collaboration with Settanta7 Architecture Studio (2023): Energy Diagnosis development and GSE practice
- Municipality of FOSSANO (Cuneo) – NZEB school building in collaboration with Settanta7 Architecture Studio (2023): Energy Diagnosis development and GSE practice
- Municipality of PERO (Milan) – NZEB school building in collaboration with Settanta7 Architecture Studio (2023): Energy Diagnosis development and GSE practice
- Municipality of VILLA SAN GIOVANNI (Reggio Calabria) – NZEB school building in collaboration with Settanta7 Architecture Studio (2023): Energy Diagnosis development and GSE practice
- Municipality of ELVA (Cuneo) – Public buildings destined for museum, shelter, and municipal buildings: Energy Diagnosis development and GSE practice.